BATCH-DEMO-001
Demo Lounge Chair — Oak & Bouclé, Oat
Cost Summary
- Direct Materials
- ₦154,000.00
- Direct Labour
- ₦85,000.00
- Total Production Cost
- ₦239,000.00
- Unit Production Cost
- ₦39,833.33
Direct Materials combines the FIFO-derived cost of every Inventory Out line issued to this batch (material drawn from stock with a destination of "batch") and any Goods Received amount charged straight to this batch. Direct Labour is only recognised — counted into the batch's cost — once the batch reaches Completed; recorded labour on a Planning or In Progress batch is shown above for visibility only and is not yet part of Total Production Cost. Once Completed, neither cost input can be changed — both are frozen, and Total Production Cost (and Unit Production Cost, when a completed quantity has been recorded) will not silently change afterward.
Status
Completed — no further status change.
Quality Control
Progress
Labour
| Name | Amount | Date | |
|---|---|---|---|
| Kelechi Obi | ₦85,000.00 | 15 Aug 2026 | Frozen |
This batch is Completed — its recognised labour cost is frozen and can no longer be added to, edited, or removed.